Friday, July 12, 2013
U.S. and South Korean Cooperation in the World Nuclear Energy Market: Major Policy Considerations
Mark Holt
Specialist in Energy Policy
A South Korean consortium signed a contract in December 2009 to provide four commercial nuclear reactors to the United Arab Emirates (UAE), signaling a new role for South Korea in the world nuclear energy market. The $20 billion deal indicates that South Korea has completed the transition from passive purchaser of turn-key nuclear plants in the 1970s to major nuclear technology supplier, capable of competing with the largest and most experienced nuclear technology companies in the world.
In the 1970s, South Korea launched its nuclear power program through the government-owned Korea Electric Company (now Korea Electric Power Corporation, KEPCO), which purchased the country’s first nuclear power units from Westinghouse. In the early years of the Korean nuclear program, Westinghouse and other foreign suppliers delivered completed plants with minimal Korean industry input. After the first three units, Korean firms took over the construction work on subsequent plants, although the reactor systems, turbine-generators, and architect/engineering services continued to be provided primarily by non-Korean companies. In 1987, KEPCO embarked on an effort to establish a standard Korean design, selecting the System 80 design from the U.S. firm Combustion Engineering as the basis. Combustion Engineering won the competition for the Korean standard design contract by agreeing to full technology transfer, according to KEPCO. The technology transfer program resulted in the development of the APR- 1400 power plant, which is the design purchased by the UAE.
In the UAE deal, the South Korean consortium is headed by KEPCO and includes other major Korean industrial companies that are involved in Korea’s rapidly growing domestic nuclear power plant construction program. The consortium also includes Pittsburgh-based Westinghouse Electric Company, which currently owns the U.S. design on which the Korean design is based, and the Japanese industrial conglomerate Toshiba, which now owns most of Westinghouse. Because the AP-1400 is based on a U.S. design, U.S. export controls will continue to apply.
U.S.-Korean nuclear energy cooperation is conducted under a “123 agreement” required by Section 123 of the Atomic Energy Act of 1954. The current agreement was signed in 1973 and will expire on March 19, 2014. A new 123 agreement does not require congressional approval, but it must lie before Congress for 90 days of continuous session before going into effect.
As with most U.S. 123 agreements, the existing U.S.-Korean agreement requires U.S. consent for any reprocessing or enrichment activities related to U.S.-supplied materials and technology. Korea is requesting that the new 123 agreement include U.S. advance consent for future Korean civilian reprocessing and enrichment activities. The United States has opposed the idea, on grounds of general nonproliferation policy and the complications that such activities might pose for other security issues on the Korean peninsula. To comply with the 90-day congressional review requirement, a new agreement probably would need to have been submitted to Congress by spring 2013. Any lapse in the agreement could affect exports of U.S. nuclear materials and reactor components to Korea, potentially affecting ongoing construction of the UAE project.
With time running out to address the fundamental U.S. and Korean differences over reprocessing, the two countries announced on April 24, 2013, that they would extend the existing agreement by two years to allow for additional negotiations. Legislation to authorize the two-year extension was introduced by Representative Royce on June 20, 2013 (H.R. 2449).
Date of Report: June 25, 2013
Number of Pages: 21
Order Number: R41032
Price: $29.95
To Order:
R42150.pdf to use the SECURE SHOPPING CART
e-mail congress@pennyhill.com
Phone 301-253-0881
For email and phone orders, provide a Visa, MasterCard, American Express, or Discover card number, expiration date, and name on the card. Indicate whether you want e-mail or postal delivery. Phone orders are preferred and receive priority processing.