Discussions of U.S. and global energy supply refer to oil, natural gas, and coal using several terms that may be unfamiliar to some. The terms used to describe different types of fossil fuels have technically precise definitions, and misunderstanding or misuse of these terms may lead to errors and confusion in estimating energy available or making comparisons among fuels, regions, or nations.
Fossil fuels are categorized, classified, and named using a number of variables. Naturally occurring deposits of any material, whether it is fossil fuels, gold, or timber, comprise a broad spectrum of concentration, quality, and accessibility (geologic, technical, and cultural). Terminology is adopted to reflect those characteristics.
For oil and natural gas, a major distinction in measuring quantities of energy commodities is made between proved reserves and undiscovered resources. Proved reserves are those amounts of oil, natural gas, or coal that have been discovered and defined, typically by drilling wells or other exploratory measures, and which can be economically recovered. In the United States, proved reserves are typically measured by private companies, who report their findings to the Energy Information Administration, and also to the Securities and Exchange Commission because they are considered capital assets. In addition to the volumes of proved reserves are deposits of oil and gas that have not yet been discovered, which are called undiscovered resources. The term has a specific meaning: undiscovered resources are amounts of oil and gas estimated to exist by examining geologic characteristics in unexplored areas. If they are considered to be recoverable using existing production technologies, they are referred to as undiscovered technically recoverable resources (UTRR). In-place resources are intended to represent all of the oil, natural gas, or coal contained in a formation or basin without regard to technical or economic recoverability.
In the United States, certain institutions are designated to determine and report quantities of oil, natural gas, and coal reserves and undiscovered resources. Other institutions also estimate these values, but differences in estimating methodology can produce significantly different values.
U.S. proved reserves of oil total 22.3 billion barrels, and reserves of natural gas total 272.5 trillion cubic feet. Undiscovered technically recoverable oil in the United States is 139.6 billion barrels, and undiscovered technically recoverable natural gas is 1445.3 trillion cubic feet. The demonstrated reserve base for coal is 486 billion short tons, of which 261 billion short tons are considered technically recoverable.
Comparisons of different fuel types can be made by converting all of them to a common unit, such as barrels of oil equivalent, based on their heat content. The amounts of fossil fuels found in other nations as reserves and undiscovered resources are much more difficult to determine reliably because data are sometimes lacking or unreliable, but gross comparisons of national endowments can be made using available data.
Date of Report: December 28, 2011
Number of Pages: 30
Order Number: R40872
Price: $29.95
Follow us on TWITTER at http://www.twitter.com/alertsPHP or #CRSreports
Document available via e-mail as a pdf file or in paper form.
To order, e-mail Penny Hill Press or call us at 301-253-0881. Provide a Visa, MasterCard, American Express, or Discover card number, expiration date, and name on the card. Indicate whether you want e-mail or postal delivery. Phone orders are preferred and receive priority processing.
Landsat and the Data Continuity Mission
Carl E. Behrens
Specialist in Energy Policy
The U.S. Landsat Mission has collected remotely sensed imagery of the Earth’s surface for more than 35 years. At present two satellites—Landsat 5, launched in 1984, and Landsat 7, launched in 1999—are in orbit and have continued to supply images and data for the many users of the information, but they are operating beyond their designed life and may fail at any time. In November 2011, imaging from Landsat 5 was suspended due to technical difficulties.
The National Aeronautics and Space Administration (NASA) and the U.S. Geological Survey (USGS) jointly operate Landsat. The two agencies are developing a follow-on initiative known as the Landsat Data Continuity Mission (LDCM). The LDCM spacecraft (LDCM 1 or Landsat 8), with its instrument payload, was planned for launch in December 2012, but is now scheduled for January 15, 2013, at the earliest. NASA advanced the project to its final pre-launch development phase November 8, 2011, proceeding to final assembly and testing of the integrated satellite system and the launch of the satellite.
Landsat has been used in a wide variety of applications, including climate research, natural resources management, commercial and municipal land development, public safety, homeland security and natural disaster management. Despite its wide use, efforts in the past to commercialize Landsat operations have not been successful. Most of the users of the data are other government agencies. For that reason, funding a replacement for the failing Landsat orbiters has been a federal responsibility.
Of particular concern early in the mission was the possibility that the new satellite might not include the capability of receiving data in the thermal infrared spectrum, a capability that is now in Landsat 5 and 7 and which some users have found particularly useful. Funding for a Thermal Infrared Sensing Instrument (TIRS) was uncertain and progress on the instrument delayed. However, NASA’s FY2009 appropriation included $10 million specifically for TIRS. NASA announced in its FY2011 budget request that TIRS would be developed in time to meet the scheduled launch date.
With LDCM 1 proceeding to launch, interest is shifting to follow-up missions. For FY2012 the Administration proposed creating a new National Land Imaging program in USGS, with a contemplated launch of Landsat 9 in 2018. The Consolidated Appropriations Act 2012 (H.R. 2055) did not agree with the move, noting in the conference report that the move would “transfer budgetary authority for the launch of Landsat satellites 9 and 10 from” NASA to USGS. The conferees suggested that the coming year be used by “all interested parties to re-examine how to proceed with future Landsat missions.”
Date of Report: December 28, 2011
Number of Pages: 10
Order Number: R40594
Price: $29.95
Follow us on TWITTER at http://www.twitter.com/alertsPHP or #CRSreports
Document available via e-mail as a pdf file or in paper form.
To order, e-mail Penny Hill Press or call us at 301-253-0881. Provide a Visa, MasterCard, American Express, or Discover card number, expiration date, and name on the card. Indicate whether you want e-mail or postal delivery. Phone orders are preferred and receive priority processing.
Friday, January 6, 2012
The Low Income Home Energy Assistance Program (LIHEAP): Program and Funding
Libby Perl
Specialist in Housing Policy
The Low Income Home Energy Assistance program (LIHEAP), established in 1981 as part of the Omnibus Budget Reconciliation Act (P.L. 97-35), is a block grant program under which the federal government makes annual grants to states, tribes, and territories to operate home energy assistance programs for low-income households. The LIHEAP statute authorizes two types of funds: regular funds (sometimes referred to as formula or block grant funds), which are allocated to all states using a statutory formula, and emergency contingency funds, which are allocated to one or more states at the discretion of the Administration in cases of emergency as defined by the LIHEAP statute.
States may use LIHEAP funds to help households pay for heating and cooling costs, for crisis assistance, weatherization assistance, and services (such as counseling) to reduce the need for energy assistance. According to the most recent data available from the Department of Health and Human Services (HHS), in FY2008, 53.3% of funds went to pay for heating assistance, 3.1% was used for cooling aid, 19.0% of funds went to crisis assistance, and 10.1% was used for weatherization. The LIHEAP statute establishes federal eligibility for households with incomes at or below 150% of poverty or 60% of state median income, whichever is higher, although states may set lower limits. In both the FY2009 and FY2010 appropriations acts, Congress gave states the authority to raise their LIHEAP eligibility standards to 75% of state median income. In FY2009, the most recent year for which HHS data are available, an estimated 35 million households were eligible for LIHEAP under the federal statutory guidelines (45 million were eligible based on the appropriations provision). According to HHS, 7.4 million households received heating or winter crisis assistance and approximately 900,000 households received cooling assistance that same year.
For FY2012, the House and Senate approved a bill (H.R. 2055) to provide $3.472 billion for LIHEAP formula grants; there is no appropriation for emergency contingency funds. (As of the date of this report, H.R. 2055was awaiting the President’s signature.) Funding for most federal programs, including LIHEAP, was included in the conference report for H.R. 2055 (H.Rept. 112- 331). The amount provided for formula grants in the conference report was $3.478 billion, but application of an across-the-board rescission of 0.189% for discretionary accounts resulted in the final appropriation of $3.472 billion. Funding for LIHEAP in FY2012 is about $1.2 billion less than was provided in FY2011, when Congress appropriated $4.5 billion for regular funds and $200 million for emergency contingency funds, but exceeds the President’s total request ($1.98 billion for regular funds and $590 million for emergency contingency funds) by about $900 million.
The amount included for LIHEAP in H.Rept. 112-331 resolved differences between proposals in the House (H.R. 3070) and Senate (S. 1599) that would have distributed funds to the states via different applications of the LIHEAP formula. Of the total appropriated as part of H.R. 2055, $497 million is to be distributed using the statutory, or “new,” LIHEAP formula, with the remainder, about $2.9 billion, distributed according to the proportions of the “old” LIHEAP formula.
This report describes LIHEAP funding, program rules, and eligibility.
Date of Report: December 22, 2011
Number of Pages: 27
Order Number: RL31865
Price: $29.95
Follow us on TWITTER at http://www.twitter.com/alertsPHP or #CRSreports
Document available via e-mail as a pdf file or in paper form.
To order, e-mail Penny Hill Press or call us at 301-253-0881. Provide a Visa, MasterCard, American Express, or Discover card number, expiration date, and name on the card. Indicate whether you want e-mail or postal delivery. Phone orders are preferred and receive priority processing.
Thursday, January 5, 2012
Legal Issues Associated with the Proposed Keystone XL Pipeline
Adam Vann
Legislative Attorney
Kristina Alexander
Legislative Attorney
Kenneth R. Thomas
Legislative Attorney
In 2008, TransCanada Corp. applied for a Presidential Permit from the State Department to construct and operate an oil pipeline across the U.S.-Canada border in a project known as Keystone XL. The Keystone XL pipeline would transport oil produced from oil sands in Alberta, Canada, to Gulf Coast refineries.
Environmental organizations and federal and state legislators are scrutinizing the State Department’s review of the Keystone XL project. Environmentalists question the adequacy of the review under the National Environmental Policy Act (NEPA), the routing of the pipeline near key aquifers, and the emissions caused by the oil production. Additionally, as states have begun to contemplate taking action with respect to the pipeline siting, some have questioned whether state siting of a pipeline is preempted by federal law. Others argue that states dictating the route of the pipeline violates the dormant Commerce Clause of the Constitution prohibiting one state from acting to protect its own interests to the detriment of other states. This report reviews those legal issues, finding generally that state oversight of pipeline siting decisions does not appear to violate federal law or the Constitution. The report also finds that the State Department’s implementation of its authority to issue Presidential Permits appears to allow for judicial review of its NEPA determinations. A companion report from CRS focusing on policy issues associated with the proposal, CRS Report R41668, Keystone XL Pipeline Project: Key Issues, by Paul W. Parfomak et al., is also available.
A final NEPA document for the Keystone XL pipeline was issued in August 2011, but the next step in the permitting process, a national interest determination, has not been completed. This determination often considers the results of the NEPA process but is a distinct decision to be made by the State Department, and in this instance the State Department has not yet issued the permit. Some have claimed the delay is costing American jobs (for the construction of the pipeline and refinery operations), while others argue the delay allows a hard look at the pipeline’s potential impacts on the environment. Congress is considering legislation that would direct issuance of the pipeline permit, in some cases limiting further environmental review. S. 1932, H.R. 3537, and H.R. 3630 each would require the Secretary of State to issue a permit for the project within 60 days of enactment, unless the President determines the project to be not in the national interest. H.R. 3548 would transfer the permitting authority over the Keystone XL pipeline project to the Federal Energy Regulatory Commission, and would require the commission to issue a permit within 30 days of enactment.
Date of Report: December 16, 2011
Number of Pages: 25
Order Number: R42124
Price: $29.95
Follow us on TWITTER at http://www.twitter.com/alertsPHP or #CRSreports
Document available via e-mail as a pdf file or in paper form.
To order, e-mail Penny Hill Press or call us at 301-253-0881. Provide a Visa, MasterCard, American Express, or Discover card number, expiration date, and name on the card. Indicate whether you want e-mail or postal delivery. Phone orders are preferred and receive priority processing.
Wednesday, January 4, 2012
Keystone XL Pipeline Project: Key Issues
Paul W. Parfomak
Specialist in Energy and Infrastructure Policy
Neelesh Nerurkar
Specialist in Energy Policy
Linda Luther
Analyst in Environmental Policy
Adam Vann
Legislative Attorney
In 2008, Canadian pipeline company TransCanada filed an application with the U.S. Department of State to build the Keystone XL pipeline, which would transport crude oil from the oil sands region of Alberta, Canada, to refineries on the U.S. Gulf Coast. Keystone XL would have the capacity to transport 830,000 barrels per day, delivering crude oil to the market hub at Cushing, OK, and further to points in Texas. The project is expected to cost more than $7.0 billion, of which at least $5.4 billion would be spent on the U.S. portion. TransCanada plans to build a short additional pipeline so that oil from the Bakken formation in Montana and North Dakota can also be carried on Keystone XL. Many Members of Congress have expressed support or opposition to the pipeline due to its potential environmental, energy security, and economic impacts.
As a facility connecting the United States with a foreign country, the pipeline requires a Presidential Permit from the State Department. In granting or denying a permit application, the State Department must determine whether a proposal is in the “national interest.” Such a determination must be arrived at in consultation with other relevant federal agencies and after public input. The determination includes an evaluation of factors including the proposed project’s potential to affect the environment, economy, energy security, or foreign policy.
Potential environmental impacts of the proposed Keystone XL project were identified and considered in an Environmental Impact Statement (EIS) prepared by the State Department pursuant to the National Environmental Policy Act (NEPA). Publication of the final EIS on August 26, 2011, marked the beginning of a 90-day review period for the national interest determination. According to the State Department, a wide range of public comments both favoring and opposing the pipeline project were received during this period. In particular, the department cited concerns regarding the pipeline’s route through the Sand Hills region of Nebraska, an extensive sand dune formation with highly porous soil and shallow groundwater.
On November 10, 2011, in response to concerns regarding the pipeline route and actions by the Nebraska legislature applicable to pipeline siting, the State Department announced a delay in its national interest determination to gather additional information necessary to assess a new pipeline route avoiding the Sand Hills. On November 14, 2011, TransCanada announced its decision to work with the Nebraska Department of Environmental Quality to identify an acceptable pipeline route around the Sand Hills. The State Department estimates that the preparation of supplemental environmental analysis necessary for a new route alternative may be complete in early 2013.
International pipeline projects like Keystone XL are not subject to the direct authority of Congress. Nonetheless, several legislative proposals seek to impose deadlines on the permit process or require a permit to be issued. The Jobs Through Growth Act (H.R. 3400) would require the President to issue a final order granting or denying the Presidential Permit for the Keystone XL pipeline within 30 days of enactment. The North American Energy Security Act (S. 1932), the American Energy Security Act (H.R. 3537), and the Middle Class Tax Relief and Job Creation Act of 2011 (H.R. 3630) would require the Secretary of State to issue a permit for the project within 60 days of enactment, unless the President publicly determines the project to be not in the national interest. The North American Energy Access Act (H.R. 3548) would transfer the permitting authority over the Keystone XL pipeline project from the State Department to the Federal Energy Regulatory Commission (FERC), and would require the commission to issue a permit for the project within 30 days of enactment.
Date of Report: December 12, 2011
Number of Pages: 27
Order Number: R41668
Price: $29.95
Follow us on TWITTER at http://www.twitter.com/alertsPHP or #CRSreports
Document available via e-mail as a pdf file or in paper form.
To order, e-mail Penny Hill Press or call us at 301-253-0881. Provide a Visa, MasterCard, American Express, or Discover card number, expiration date, and name on the card. Indicate whether you want e-mail or postal delivery. Phone orders are preferred and receive priority processing.
Subscribe to:
Posts (Atom)