Wednesday, December 11, 2013

Legislation Proposed to Implement the U.S.- Mexico Transboundary Hydrocarbons Agreement - R43204


Curry L. Hagerty
Specialist in Energy and Natural Resources Policy

James C. Uzel
Geospatial Information Systems Analyst

The offshore areas of the Gulf of Mexico provide a setting for domestic and international energy production, U.S. military training and border operations, trade and commerce, fishing, tourist attractions, and recreation. These governmental, commercial, and cultural activities depend on healthy and productive marine and coastal areas for a range of economic and social benefits. Consequences of hurricanes and oil spills demonstrate that offshore areas in the Gulf of Mexico are governed by a number of interrelated legal regimes, including treaties and international, federal, and state laws.

A key congressional interest has been the federal role in managing energy resources in deepwater areas of the Gulf of Mexico, particularly in waters beyond the U.S. exclusive economic zone (EEZ), more than 200 miles from shore. In 2012, the United States and Mexico signed an agreement known as the U.S.-Mexico Transboundary Hydrocarbons Agreement (the Agreement). This Agreement could mark the start of an energy partnership in an area of international waters that the U.S. Department of the Interior’s (DOI’s) Bureau of Ocean Energy Management (BOEM) estimates to contain as much as 172 million barrels of oil and 304 billion cubic feet of natural gas. The main purposes of the partnership would be to lift a moratorium and to jointly develop reservoirs of oil and natural gas, referred to as “transboundary resources,” that exist in areas straddling the marine border of both countries. The Agreement stems from a series of bilateral treaties originating in the 1970s. Like other diplomatic measures, for the Agreement to take effect, it must be placed before each country’s national lawmakers for review. To date, Mexico has completed review and accepted the Agreement. The Agreement awaits the passage of implementing legislation in the U.S. Congress.

In the United States, implementing legislation involves the two main commitments of the Agreement. First, under the Agreement, the two countries establish a framework for jointly developing 1.5 million acres along a 550-mile border. Diplomats on both sides of the border claim that this framework achieves a mutual goal of greater options for energy production to help gain greater energy independence for both countries. A concurrent commitment is to dismantle a treaty-based moratorium on oil and gas development agreed to in 2000, encompassing 158,584 acres along a 135-mile portion of the border. Current treaty provisions establish that the ban will expire in 2014.

Implementing the Agreement faces hurdles in both countries. In the United States, among other hurdles, is the transitional status of U.S. safety reforms announced after the 2010 Deepwater Horizon spill. These reforms are being phased in and full implementation is not anticipated until later in 2013 and 2014. These regulations are considered by industry and U.S. regulators to be a more robust set of deepwater drilling standards than were in place prior to the Deepwater Horizon spill. Until they take full effect, the treaty-based moratorium is perceived by many as a necessary mechanism to protect against the risk of oil spills. In Mexico, although the Agreement has been accepted, implementation poses various constitutional and regulatory challenges.

U.S. legislation to approve and implement the Agreement includes H.R. 1613 and S. 812. On June 27, 2013, the House passed H.R. 1613 (H.Rept. 113-101). On October 14, 2013, the Senate passed S. 812. Absent a deadline for U.S. approval of the Agreement and consideration of implementing legislation, if any, it is difficult to predict the timing of further legislative action. Many in Congress have expressed the view that the expiration of the moratorium in 2014 will prove a catalyst for legislative attention during the remainder of the 113
th Congress.

Date of Report: November 6, 2013
Number of Pages: 31
Order Number: R43204
Price: $29.95


To Order:



R43204 .pdf   to use the SECURE SHOPPING CART


e-mail congress@pennyhill.com

Phone 301-253-0881


For email and phone orders, provide a Visa, MasterCard, American Express, or Discover card number, expiration date, and name on the card. Indicate whether you want e-mail or postal delivery. Phone orders are preferred and receive priority processing

Tuesday, December 10, 2013

Keystone XL Pipeline Project: Key Issues - R41668


Paul W. Parfomak
Specialist in Energy and Infrastructure Policy

Robert Pirog
Specialist in Energy Economics

Linda Luther
Analyst in Environmental Policy

Adam Vann
Legislative Attorney

TransCanada’s proposed Keystone XL Pipeline would transport oil sands crude from Canada and shale oil produced in North Dakota and Montana to a market hub in Nebraska for further delivery to Gulf Coast refineries. The pipeline would consist of 875 miles of 36-inch pipe with the capacity to transport 830,000 barrels per day. Because it would cross the Canadian-U.S. border, construction of Keystone XL requires a Presidential Permit from the State Department. A decision to issue or deny a Presidential Permit is based on a determination that a project would serve the national interest, considering potential impacts on the environment, the economy, energy security, foreign policy, and other factors. Environmental impacts are evaluated and documented in an Environmental Impact Statement (EIS) under the National Environmental Policy Act (NEPA).

TransCanada originally applied for a Presidential Permit for the Keystone XL Pipeline in 2008. The initial proposal included a southern segment from Oklahoma to the Gulf Coast. A key issue that arose during the permit review was concern over environmental impacts in the Sand Hills region of Nebraska. This concern led the Nebraska legislature to enact new state pipeline siting requirements that would alter the pipeline route through Nebraska. In January 2012, the State Department concluded that it would not have sufficient information to evaluate an altered pipeline route before a deadline imposed by Congress and denied the permit. The southern segment of the original Keystone XL proposal, now called the Gulf Coast Project, was subsequently separated from the original proposal because it did not require a Presidential Permit. It has been approved by the relevant states and is currently under construction.

In May 2012, TransCanada reapplied to the State Department for a Presidential Permit to build the northern, cross-border segment of Keystone XL. The new permit application initiated a new NEPA process. The governor of Nebraska approved a new route through the state avoiding the Sand Hills on January 22, 2013. On March 6, 2013, notice was published in the Federal Register that the State Department draft EIS for the reconfigured Keystone XL Project was available for public comment. The department is in the process of addressing these comments as it prepares a final EIS. When the final EIS is issued, a 90-day public review period for the national interest determination begins. The department has not stated when it plans to complete this process.

Development of Keystone XL has been controversial. Proponents base their arguments primarily on increasing the diversity of the U.S. petroleum supply and economic benefits, especially jobs. Pipeline opposition stems in part from concern regarding the greenhouse gas emissions associated with the development of Canadian oil sands, continued U.S. dependency on fossil fuels, and the risk of a potential release of heavy crude.

In light of the State Department’s denial of the 2008 permit application, some in Congress seek other means to support development of the pipeline. The Energy Production and Project Delivery Act of 2013 (S. 17) would eliminate the Presidential Permit requirement for the reconfigured Keystone XL Project. The Keystone for a Secure Tomorrow Act (H.R. 334) and a Senate bill to approve the Keystone XL Project (S. 582) would directly approve Keystone XL under the authority of Congress to regulate foreign commerce. The Northern Route Approval Act (H.R. 3) would eliminate the Presidential Permit requirement for Keystone XL, among other provisions. The Senate passed an amendment to the Fiscal 2014 Senate Budget Resolution (S.Con.Res. 8) that would provide for the approval and construction of the Keystone XL Project (S.Amdt. 494). The North American Energy Infrastructure Act (H.R. 3301) would transfer permit authority for oil pipelines from the State Department to the Department of Commerce and would make other changes to the pipeline permitting process.

Date of Report: December 2, 2013
Number of Pages: 43
Order Number: R41668
Price: $29.95


To Order:



R41668 .pdf   to use the SECURE SHOPPING CART


e-mail congress@pennyhill.com

Phone 301-253-0881


For email and phone orders, provide a Visa, MasterCard, American Express, or Discover card number, expiration date, and name on the card. Indicate whether you want e-mail or postal delivery. Phone orders are preferred and receive priority processing

Wednesday, November 27, 2013

Carbon Capture Technology Assessment: In Brief


Peter Folger
Specialist in Energy and Natural Resources Policy

Carbon capture and sequestration (CCS) is widely seen as a critical strategy for limiting atmospheric emissions of carbon dioxide (CO
2)—the principal “greenhouse gas” linked to global climate change—from power plants and other large industrial sources. This report focuses on the first component of a CCS system, the CO2 capture process. Unlike the other two components of CCS, transportation and geologic storage, the CO2 capture component of CCS is heavily technology-dependent. For CCS to succeed at reducing CO2 emissions from a significant fraction of large sources in the United States, CO2 capture technologies would need to be deployed widely. Widespread commercial deployment would likely depend, in part, on the cost of the technology deployed to capture CO2. This report summarizes prospects for improved, lower-cost technologies for each of the three current approaches to CO2 capture: post-combustion capture; pre-combustion capture; and oxy-combustion capture. CRS Report R41325, Carbon Capture: A Technology Assessment, provides a more detailed analysis of these technologies.

While all three approaches are capable of high capture efficiencies (typically about 90%), the major drawbacks of current processes are their high cost and the large energy requirements for operation. Another drawback is that at present there are still no full-scale applications of CO
2 capture on a coal-fired or gas-fired power plant; these plants produce over a third of total U.S. CO2 emissions from fossil fuel combustion. However, a number of large-scale demonstration projects at both coal combustion and gasification-based power plants are planned or underway in the United States and elsewhere. Substantial research and development (R&D) activities are also underway in the United States and elsewhere to develop and commercialize lower-cost capture systems with smaller energy penalties. Current R&D activities include development and testing of new or improved solvents that can lower the cost of current post-combustion and precombustion capture, as well as research on a variety of potential “breakthrough technologies” such as novel solvents, sorbents, membranes, and oxyfuel systems that hold promise for even lower-cost capture systems.

The future use of coal in the United States will likely depend on whether and how CCS is deployed if legislative or regulatory actions curtail future CO
2 emissions. Congressional interest in CCS was renewed when the U.S. Environmental Protection Agency (EPA) re-proposed standards for carbon dioxide (CO2) emissions from new fossil-fueled power plants on September 20, 2013. These re-proposed standards would not apply to existing power plants. As re-proposed, the standards would limit emissions of CO2 to no more than 1,100 pounds per megawatt-hour of production from new coal-fired power plants and between 1,000 and 1,100 for new natural gasfired plants. According to EPA, new natural gas-fired stationary power plants should be able to meet the proposed standards. However, new coal-fired plants only would be able to meet the standards by installing CCS technology, which could add significant capital costs.

In general, the focus of most current R&D activities is on cost reduction rather than additional gains in CO
2 capture efficiency. Key questions include: when would advanced CO2 capture systems be available for commercial rollout; and how much cheaper they would be compared to current technology. “Technology roadmaps” developed by governmental and private-sector organizations anticipate that CO2 capture may be available for commercial deployment at power plants by 2020. Some roadmaps also project that some novel, lower-cost technologies may be commercial by 2020. Such projections acknowledge, however, that this will require aggressive efforts to advance promising concepts to commercial viability.

Date of Report: November 5, 2013
Number of Pages: 12
Order Number: R43300
Price: $29.95